Every step, accounted for.

Varion AI designs and builds custom workflow software. Every request, check and approval is recorded, so you can always see who did what, and why.

A few of the things we build

  • Case and request handling
  • Approval and sign-off flows
  • Document and evidence records
  • Reporting and dashboards
  • AI inside the workflow
  • Connect and modernise
  • Something else? Ask us
What we build

Built around the way your work runs.

If work in your organisation moves through requests, approvals, documents and reports, we can build software for it.

  • Case and request handling

    Every request tracked from first contact to the final decision.

  • Approval and sign-off flows

    Who approved what, and when, kept with the work itself.

  • Document and evidence records

    Each document kept with the step it supports, revision by revision.

  • Reporting and dashboards

    Reports built straight from the record, not retyped by hand.

  • AI inside the workflow

    Drafting, summarising and sorting, with a person approving every result.

  • Connect and modernise

    Your existing systems linked, so data moves without retyping.

Not on this list? These are only examples. Tell us how your work runs, and we will map it before anything is built.

See all three services

Two examples you can try yourself.

Varion Casefile and Varion Evidence are two examples of what we build, not the limit of it. Both run below as interactive demos on synthetic data.

Varion Casefile

Every scam case, on the record.

Case handling for scam and fraud reports, built for smaller Malaysian financial institutions.

Explore Casefile

Interactive demo

Try Varion Casefile

The guide card in the demo shows what to click next. Everything runs on synthetic data, and nothing you click leaves this page.

Varion CasefileDemo Bank Berhad (synthetic data)Synthetic data
DEMO-2026-0002InvestigatingPending decisionDecidedClosedCritical priority

Fake PDRM officer, parcel with drugs

Authorised (customer initiated the payment) Impersonation scam (officials, bank, parcel) Internet banking

MYR 65,000.00 MYR 12,000.00 recovered

You are
Case views

Step 1 of 4

You are Farah Lim, the analyst

This scam case has been investigated and reported to NSRC, and its controls have been assessed, as the road to decision shows. The outcome is proposed on the Decision tab.

Open the Decision tab.

Step 1 of 4

Propose the outcome

For an authorised payment with a control gap, Casefile's guidance suggests a goodwill payment. Farah proposes one, and Casefile sends it for independent review.

Press Propose decision.

Step 1 of 4

Nothing to review yet

Kumar Selvam reviews decisions, and none has been proposed. In Casefile a reviewer may propose too; in this demo Farah proposes and Kumar reviews.

Switch to Farah Lim, the analyst.

Step 2 of 4

No Approve button for Farah

Farah proposed this decision, so Casefile does not offer her Approve. Under four-eyes someone else must review it, and that holds for an administrator too.

Switch to Kumar Selvam, the reviewer.

Step 2 of 4

Kumar can review it

Kumar is a reviewer and did not propose this decision, so Casefile offers him Approve on the Decision tab.

Open the Decision tab.

Step 2 of 4

Kumar can approve it

Kumar is a reviewer and did not propose this decision, so Casefile offers him Approve, which Farah never saw.

Press Approve.

Step 3 of 4

Approved by a second person

The decision now carries two names, and the case is Decided. Once the customer is told the outcome, the analyst or the reviewer closes the case.

Press Change status to Closed.

Step 4 of 4

Case closed

The closure is on the timeline and in the audit trail, and a closed case takes no new entries. The case file puts the whole case on one record.

Press Case file.

Done

The whole case, on one record

The case file holds the case summary, the customer's account, the classification, the duty-of-care assessment, the timeline, the decision and the audit trail.

Explore the tabs, or start again.

Start again

Explore

Timeline and evidence

Every event on the case, newest first. The timeline is append-only: once recorded, an entry cannot be edited or removed.

Press Add entry to record a funds freeze request.

Explore

Entry added

The freeze request is on the timeline for good, and the audit trail records who added it.

Open the Decision tab to carry on.

Explore

Casefile writes the status changes

Proposing moved the case to Pending decision, and Casefile put that on the timeline itself. Nothing here can be edited or removed.

Open the Decision tab to carry on.

Explore

Duty of care

The institution's own controls, assessed before the customer's conduct. Ten of the eleven that apply were applied. REP-01 was not: the case has no National Fraud Portal submission.

Open a group to see each control and its evidence.

Explore

Audit trail

Every create, change, decision, download and export is recorded here automatically, newest first, and the database refuses edits to this table.

Your own steps appear at the top.

DEMO-2026-0002

Fake PDRM officer, parcel with drugs

Demo Bank Berhad (synthetic data)

Case file generated

Status: Closed

  1. 1. Case summaryAuthorised (customer initiated the payment). Impersonation scam (officials, bank, parcel). MYR 65,000.00 lost, MYR 12,000.00 recovered. Reported to NSRC 15 Oct 2026, 11:30.
  2. 2. Customer's accountA caller claiming to be from PDRM Bukit Aman said a parcel containing drugs was registered in the customer's name and instructed him to move his savings to a safe account for investigation. (Synthetic demonstration data.)
  3. 3. ClassificationCustomer Initiated Payment: Yes. Third Party Instruction: Yes. Customer Ignored Warning: Yes.
  4. 4. Duty-of-care assessment (institution's controls)12 controls: 10 Applied, 1 Not applied (REP-01), 1 Not assessed (REP-02), assessed by Farah Lim.
  5. 5. Timeline and evidenceEvery entry, oldest first, with its files and their SHA-256 checksums.9 entries and 1 file10 entries and 1 file
  6. 6. Reimbursement decisionGoodwill payment, MYR 15,900.00, split 30% / 70%. Proposed by Farah Lim, approved by Kumar Selvam.
  7. 7. Audit trailEvery recorded action before this file was generated.21 entries22 entries

Prepared by (name, signature, date)Reviewed by (name, signature, date)

In Varion Casefile the case file opens as a page to print or save as PDF.

Customer's account of events

A caller claiming to be from PDRM Bukit Aman said a parcel containing drugs was registered in the customer's name and instructed him to move his savings to a safe account for investigation. (Synthetic demonstration data.)

Regulatory reporting

NSRC (997)
15 Oct 2026, 11:30
PayNet National Fraud Portal
Not submitted
Police report
KL/DEMO/2026/5002

Road to decision

  1. ClassifiedAuthorised (customer initiated the payment)
  2. Reported to NSRC15 Oct 2026, 11:30
  3. Duty of care assessed10 of 11 applied, 1 gap(s)
  4. DecisionGuidance: Goodwill paymentGoodwill payment: Awaiting reviewGoodwill payment: Approved
  5. ClosedClose once the customer is informed

Before this is final

Independent review by a reviewer or administrator is required before the decision is final (four-eyes principle).

Timeline and evidence

Append-only. Entries cannot be edited or removed once recorded.

  1. Internal noteStatus changed to ClosedCustomer informed of the outcome.Recorded by Farah LimRecorded by Kumar Selvam
  2. Internal noteStatus changed to DecidedDecision Goodwill payment approved.Recorded by Kumar Selvam
  3. Internal noteStatus changed to Pending decisionA reimbursement decision was proposed and is awaiting independent review.Recorded by Farah Lim
  4. Funds freeze / trace requestFreeze request sent to the receiving bankRequest to hold the funds while the trace runs.Recorded by Farah LimRecorded by Kumar Selvam
  5. Internal noteStatus changed to InvestigatingRecorded by Farah Lim
  6. Internal noteStatus changed to TriageRecorded by Farah Lim
  7. Police reportPolice report recorded (KL/DEMO/2026/5002)Recorded by Farah Lim
  8. Internal noteCase openedCase DEMO-2026-0002 created. 12 duty-of-care controls added for assessment.Recorded by Farah Lim
  9. NSRC reportReported to the National Scam Response Centre (NSRC)Recorded by Farah Lim
  10. Customer contactCustomer interviewed by phoneStatement recorded; customer consented to the investigation and to data sharing with NSRC where applicable.customer-statement.txtRecorded by Farah Lim

Assess the institution's own controls before weighing the customer's conduct.

Duty-of-care checklist

11 of 11 applicable controls assessed

Authentication3 Applied
  • AUTH-01Secure (non-SMS-OTP) authentication used for the transactionTransaction was authenticated with in-app or equivalent secure authentication rather than SMS OTP, in line with the migration directive.Confirmed from system records (AUTH-01).Assessed by Farah LimApplied
  • AUTH-02Single-device binding enforcedOnline banking access was restricted to one registered secure device at the time of the transaction.Confirmed from system records (AUTH-02).Assessed by Farah LimApplied
  • AUTH-03Cooling-off period applied to first-time enrolment or new deviceA cooling-off period was applied before a newly enrolled account or newly registered device could transact.Confirmed from system records (AUTH-03).Assessed by Farah LimApplied
Transaction controls2 Applied
  • TXN-01Transaction limits enforcedDaily and per-transaction limits, including customer-set limits, were enforced for the disputed transaction(s).Confirmed from system records (TXN-01).Assessed by Farah LimApplied
  • TXN-02Call-back or additional verification for high-risk transactionA call-back or additional verification step was performed for a high-risk, high-value or first-time payee transaction.Confirmed from system records (TXN-02).Assessed by Farah LimApplied
Customer warnings2 Applied
  • WARN-01Scam warning shown at point of paymentA scam warning, payee confirmation or risk message was displayed to the customer before the payment was confirmed.Confirmed from system records (WARN-01).Assessed by Farah LimApplied
  • WARN-02Prior fraud awareness communication to customerThe customer had received fraud awareness communication (in-app notice, campaign, statement insert) relevant to this scam type before the incident.Confirmed from system records (WARN-02).Assessed by Farah LimApplied
Detection and response3 Applied
  • DET-01Anomaly detection alert raisedFraud monitoring generated an alert for the out-of-pattern transaction and the alert was actioned.Confirmed from system records (DET-01).Assessed by Farah LimApplied
  • RESP-01Kill switch available and actionedThe self-service kill switch was available and, once the customer reported, access was suspended promptly.Confirmed from system records (RESP-01).Assessed by Farah LimApplied
  • RESP-02Report acknowledged and funds trace initiated within SLAThe customer's report was acknowledged and a funds trace or freeze request was initiated within the institution's service level.Confirmed from system records (RESP-02).Assessed by Farah LimApplied
Reporting and timeliness1 Not applied, 1 Not assessed
  • REP-01Reported to NSRC and National Fraud Portal on timeThe case was reported to the National Scam Response Centre and lodged in the National Fraud Portal within the institution's required timeframe.Reported to NSRC on 15 Oct 2026. No National Fraud Portal submission is recorded for this case.Assessed by Farah LimNot applied
  • REP-02Investigation completed within prescribed timeframeThe investigation and outcome communication met the timeframe prescribed under SEFT, or financial assistance was provided where it did not.Applies to unauthorised transactions only; not relevant to this case.Not assessed

Decisions

No decision has been proposed yet. Complete the duty-of-care assessment, then propose the outcome for independent review.

Goodwill payment MYR 15,900.00Awaiting reviewApproved

Waiting for someone else to review (four-eyes)

Liability split
Institution 30% · Customer 70%
Rationale
Demo rationale: bank-side control gap(s) REP-01 identified. Customer factors considered as recorded in the indicators.
Proposed by
Farah Lim
Approved by
Kumar Selvam
Guidance at the time
Goodwill payment

Audit trail for this case

Newest first; the database refuses edits to this table

  1. case.file_generatedDEMO-2026-0002: case file generatedFarah LimKumar Selvam
  2. case.status_changedDEMO-2026-0002: Decided to ClosedFarah LimKumar Selvam
  3. decision.approvedDEMO-2026-0002: decision approvedKumar Selvam
  4. decision.proposedDEMO-2026-0002: Goodwill payment proposed (15900.00 MYR)Farah Lim
  5. case.event_addedDEMO-2026-0002: Funds freeze / trace request recordedFarah LimKumar Selvam
  6. case.control_assessedDEMO-2026-0002: REP-01 marked Not appliedFarah Lim
  7. case.control_assessedDEMO-2026-0002: RESP-02 marked AppliedFarah Lim
  8. case.control_assessedDEMO-2026-0002: RESP-01 marked AppliedFarah Lim
  9. case.control_assessedDEMO-2026-0002: WARN-02 marked AppliedFarah Lim
  10. case.control_assessedDEMO-2026-0002: WARN-01 marked AppliedFarah Lim
  11. case.control_assessedDEMO-2026-0002: DET-01 marked AppliedFarah Lim
  12. case.control_assessedDEMO-2026-0002: TXN-02 marked AppliedFarah Lim
  13. case.control_assessedDEMO-2026-0002: TXN-01 marked AppliedFarah Lim
  14. case.control_assessedDEMO-2026-0002: AUTH-03 marked AppliedFarah Lim
  15. case.control_assessedDEMO-2026-0002: AUTH-02 marked AppliedFarah Lim
  16. case.control_assessedDEMO-2026-0002: AUTH-01 marked AppliedFarah Lim
  17. case.attachment_addedDEMO-2026-0002: evidence file "customer-statement.txt" attachedFarah Lim
  18. case.event_addedDEMO-2026-0002: Customer contact recordedFarah Lim
  19. case.status_changedDEMO-2026-0002: Triage to InvestigatingFarah Lim
  20. case.status_changedDEMO-2026-0002: New to TriageFarah Lim
  21. case.reporting_updatedDEMO-2026-0002: regulatory reporting details updatedFarah Lim
  22. case.assignedDEMO-2026-0002 assigned to Farah LimFarah Lim
  23. case.createdCreated case DEMO-2026-0002Farah Lim
How to use this demo
  1. Open the Decision tab and propose the outcome as Farah.Done
  2. Switch to Kumar, the reviewer, and approve it.Done
  3. Close the case.Done
  4. Open the case file.Done

Also try Add a timeline entry, and look through Duty of care and Audit.

Start again
Varion Evidence

Every report line, traced to its source.

Pick a line from this synthetic weekly report to see the record it relies on.

Explore Evidence

Interactive demo

Try Varion Evidence

The guide card in the demo shows what to click next. Everything runs on synthetic data, and nothing you click leaves this page.

Meridian Works · 31 Aug – 06 Sep 2026 · revision 07Meridian Works · 31 Aug – 06 Sep 2026 · revision 08

Review queueReady for reviewDraftSynthetic data

Demo role
Report views

Step 1 of 3

Check the calculation

This line is a calculation from row 18 of the progress register: 36 of 48 pile caps is 75%. Evidence asks the reviewer to check it against the source.

Tick the box under Reviewer decision.

Step 1 of 3

Approve the line

With the calculation checked, Approve claim records Sofia's review of revision 1 and confirms the calculation in one step.

Press Approve claim.

Step 1 of 3

Now the calculation line

Completed work is reviewed. Progress against baseline still needs its calculation checked and the line approved.

Pick Progress against baseline.

Step 1 of 3

Approval needs a reviewer

Nur Aina is the document controller. Evidence offers Approve claim only to a reviewer.

Switch to Sofia Lim, the reviewer.

Step 2 of 3

Approval needs a reviewer

Nur Aina is the document controller. Evidence offers Approve claim only to a reviewer.

Switch to Sofia Lim, the reviewer.

Step 2 of 3

Line reviewed

Revision 1 is reviewed by Sofia Lim, and its calculation is confirmed. Both are conditions for release.

Pick Completed work.

Step 2 of 3

A source in Bahasa Malaysia

This line cites page 4 of the weekly site diary. Compare the Malay excerpt and its English explanation with the statement before approving.

Press Approve claim.

Step 3 of 3

What if a source is withdrawn?

Records change after review. In Evidence a document controller, not a reviewer, decides which records may support a report.

Switch to Nur Aina, the document controller.

Step 3 of 3

Withdraw the site diary

Nur Aina sets the diary's authority to Withdrawn. Before she saves, Evidence shows which reviews the change will undo.

Press Save authority change.

Step 3 of 3

You are Nur Aina, the document controller

She decides which records may support a report, such as the site diary behind Completed work.

Pick Completed work.

Step 3 of 3

The review was undone

Evidence cleared the review of the line that cited the diary, and the report moved to revision 08, back in Draft, so it must be submitted again.

Open Release preflight.

Step 3 of 3

The report changed

Withdrawing the diary moved the report to revision 08, back in Draft. Release preflight shows what release now waits for.

Open Release preflight.

Explore

This line cannot be approved

Its source, RFI-017, is unverified, and the statement conflicts with it: the consultant's response is still pending. Evidence blocks approval until both are resolved.

Pick another line to carry on.

Explore

A forecast line

This line forecasts a delivery from the procurement schedule, revision B. A reviewer approves a forecast like any other line.

Press Approve claim, or pick another line.

Explore

A forecast line

This line forecasts a delivery from the procurement schedule, revision B. A reviewer approves a forecast like any other line.

Pick another line to carry on.

Explore

Forecast reviewed

Revision 1 of this line is reviewed by Sofia Lim. Release needs every line reviewed, not only the ones in the steps.

Pick another line to carry on.

Explore

Release preflight

Every gate must pass on the exact revision being released. The RFI-017 line fails three of them, so this report cannot be released yet.

Go back to Review queue to carry on.

Done

What release waits for

The withdrawn diary fails its evidence gate, its line is no longer reviewed, and revision 08 is in Draft. Release waits until every gate passes.

That is the whole demo. Explore, or start again.

Start again

0 of 4 claims reviewed1 of 4 claims reviewed2 of 4 claims reviewed3 of 4 claims reviewed

Claims to review
Source inspectorApproved

VE-CIV-001Rev CCSV

Structural progress register

Row 18 · columns B–E

Exact source excerpt English

Zone B | Pile caps completed: 36 | Approved scope: 48 | Unit: each

Deterministic calculationConfirmed

36 ÷ 48 × 100 = 75%

Completed / approved scope · pile caps. The denominator must be the approved scope, not a working figure.

Reviewer decision

Approval interactions are available to the reviewer role. Switch the demo role to reviewer to inspect them.

I checked the inputs, units and calculation against the source.

Approve claim

Evidence states

  • Evidence available1 approved source covers the reporting period.
  • Calculation unconfirmedThe reviewer must confirm inputs, units and the rule before approving.
  • Calculation confirmedA reviewer checked inputs, units and the rule against the source.
  • Needs reviewRevision 1 has no independent review yet.
  • ReviewedRevision 1 was reviewed by Sofia Lim.
Source inspectorApprovedWithdrawn

VE-CIV-002Rev CPDF

Laporan tapak mingguan

Page 4 · Section 2.1

Exact source excerpt Malay

Kerja pemasangan tetulang bagi zon B telah disiapkan pada 3 September 2026. Pemeriksaan direkodkan dalam daftar tapak.

English explanation

Reinforcement installation for Zone B was completed on 3 September 2026. An inspection was recorded in the site register.

Reviewer decision

Approval interactions are available to the reviewer role. Switch the demo role to reviewer to inspect them.

Approval is disabled while evidence states block this claim.

Approve claim

Authority state

Set Laporan tapak mingguan, revision C, from Approved to Withdrawn.

Saving invalidates 1 review across 1 claim.

Evidence states

  • Source withdrawnLaporan tapak mingguan was withdrawn. It cannot support a released claim.
  • Evidence available1 approved source covers the reporting period.
  • Needs reviewRevision 1 has no independent review yet.
  • ReviewedRevision 1 was reviewed by Sofia Lim.
Source inspectorApproved

VE-CIV-003Rev BPDF

Procurement delivery schedule

Page 2 · Delivery milestones

Exact source excerpt English

Cable tray delivery: 11 September 2026. Supplier confirmation remains pending.

Reviewer decision

Approval interactions are available to the reviewer role. Switch the demo role to reviewer to inspect them.

Evidence states

  • Evidence available1 approved source covers the reporting period.
  • Needs reviewRevision 1 has no independent review yet.
  • ReviewedRevision 1 was reviewed by Sofia Lim.
Source inspectorUnverified

VE-CIV-004Rev APDF

RFI-017 · Drawing clarification

Page 1 · Proposed clarification

Exact source excerpt English

Revised opening dimensions are proposed. Consultant response is pending.

Reviewer decision

Approval interactions are available to the reviewer role. Switch the demo role to reviewer to inspect them.

Approval is disabled while evidence states block this claim.

Approve claim

Evidence states

  • Conflicting recordsStatement conflicts with the source: consultant response is pending.
  • Source unverifiedRFI-017 · Drawing clarification has no confirmed approval. A controller must set its authority.
  • Needs reviewRevision 1 has no independent review yet.

Release preflight

Every gate must pass on the exact revision you are releasing. The release is transactional: it either records the whole snapshot or nothing.

Conditions outstandingResolve each failing gate at its source. Preflight re-evaluates the current revision every time.

Authorisation

  • A project existsMeridian WorksPassedFailed
  • Released by an authorised reviewerSofia Lim holds the reviewer role.Your current role is controller. Only a reviewer can release.PassedFailed
  • Reviewer is not the authorAuthor and releasing reviewer are different people.PassedFailed

Report

  • The report has claims4 claims in revision 7.4 claims in revision 8.PassedFailed

Claims

  • Progress against baseline: eligible evidenceSources are approved, current and extracted.PassedFailed
  • Progress against baseline: current revision reviewedRevision 1 reviewed.Revision 1 needs an independent review.PassedFailed
  • Progress against baseline: calculation confirmedInputs, units and rule confirmed by the reviewer.A reviewer must confirm the calculation against its source.PassedFailed
  • Completed work: eligible evidenceSources are approved, current and extracted.Laporan tapak mingguan: withdrawnPassedFailed
  • Completed work: current revision reviewedRevision 1 reviewed.Revision 1 needs an independent review.PassedFailed
  • Procurement and delivery: eligible evidenceSources are approved, current and extracted.PassedFailed
  • Procurement and delivery: current revision reviewedRevision 1 reviewed.Revision 1 needs an independent review.PassedFailed
  • RFIs and changes: eligible evidenceStatement conflicts with the source: consultant response is pending.PassedFailed
  • RFIs and changes: RFI-017 · Drawing clarification: unverifiedRFI-017 · Drawing clarification: unverifiedPassedFailed
  • RFIs and changes: current revision reviewedRevision 1 needs an independent review.PassedFailed
Prepare demo release
How to use this demo
  1. Tick the calculation box and approve Progress against baseline.Done
  2. Approve Completed work against the Malay site diary.Done
  3. Switch to Nur Aina, withdraw the diary, then open Release preflight.Done

Also try Procurement and delivery, a forecast, and RFIs and changes, the line that cannot be approved.

Start again

How a project runs.

Four steps. Price, timeline and scope are set after a scoping call.

  1. Trace

    We map how the work really happens.

  2. Prototype

    A working version on synthetic data.

  3. Pilot

    Shaped to your workflow, in phases.

  4. Scale

    More teams, more steps, more systems.

Hirthic, Managing Director of Varion AI.
Who you will work with

Hirthic

Managing Director, Varion AI

A senior software engineer in payment systems, backend, data engineering and AI. He designs and builds every Varion product.

Meet Hirthic

See our software working on synthetic data.

A 30-minute walkthrough, then a conversation about your workflow.

Request a walkthrough

You will hear back from Hirthic.