Every step, accounted for.
Varion AI designs and builds custom workflow software. Every request, check and approval is recorded, so you can always see who did what, and why.
A few of the things we build
Case and request handling
Approval and sign-off flows
Document and evidence records
Reporting and dashboards
AI inside the workflow
Connect and modernise- Something else? Ask us
Built around the way your work runs.
If work in your organisation moves through requests, approvals, documents and reports, we can build software for it.

Case and request handling
Every request tracked from first contact to the final decision.

Approval and sign-off flows
Who approved what, and when, kept with the work itself.

Document and evidence records
Each document kept with the step it supports, revision by revision.

Reporting and dashboards
Reports built straight from the record, not retyped by hand.

AI inside the workflow
Drafting, summarising and sorting, with a person approving every result.

Connect and modernise
Your existing systems linked, so data moves without retyping.
Not on this list? These are only examples. Tell us how your work runs, and we will map it before anything is built.
See all three servicesTwo examples you can try yourself.
Varion Casefile and Varion Evidence are two examples of what we build, not the limit of it. Both run below as interactive demos on synthetic data.
Every scam case, on the record.
Case handling for scam and fraud reports, built for smaller Malaysian financial institutions.
Explore CasefileInteractive demo
Try Varion Casefile
The guide card in the demo shows what to click next. Everything runs on synthetic data, and nothing you click leaves this page.
Fake PDRM officer, parcel with drugs
MYR 65,000.00 MYR 12,000.00 recovered
Step 1 of 4
You are Farah Lim, the analyst
This scam case has been investigated and reported to NSRC, and its controls have been assessed, as the road to decision shows. The outcome is proposed on the Decision tab.
Open the Decision tab.
Step 1 of 4
Propose the outcome
For an authorised payment with a control gap, Casefile's guidance suggests a goodwill payment. Farah proposes one, and Casefile sends it for independent review.
Press Propose decision.
Step 1 of 4
Nothing to review yet
Kumar Selvam reviews decisions, and none has been proposed. In Casefile a reviewer may propose too; in this demo Farah proposes and Kumar reviews.
Switch to Farah Lim, the analyst.
Step 2 of 4
No Approve button for Farah
Farah proposed this decision, so Casefile does not offer her Approve. Under four-eyes someone else must review it, and that holds for an administrator too.
Switch to Kumar Selvam, the reviewer.
Step 2 of 4
Kumar can review it
Kumar is a reviewer and did not propose this decision, so Casefile offers him Approve on the Decision tab.
Open the Decision tab.
Step 2 of 4
Kumar can approve it
Kumar is a reviewer and did not propose this decision, so Casefile offers him Approve, which Farah never saw.
Press Approve.
Step 3 of 4
Approved by a second person
The decision now carries two names, and the case is Decided. Once the customer is told the outcome, the analyst or the reviewer closes the case.
Press Change status to Closed.
Step 4 of 4
Case closed
The closure is on the timeline and in the audit trail, and a closed case takes no new entries. The case file puts the whole case on one record.
Press Case file.
Done
The whole case, on one record
The case file holds the case summary, the customer's account, the classification, the duty-of-care assessment, the timeline, the decision and the audit trail.
Explore the tabs, or start again.
Start againExplore
Timeline and evidence
Every event on the case, newest first. The timeline is append-only: once recorded, an entry cannot be edited or removed.
Press Add entry to record a funds freeze request.
Explore
Entry added
The freeze request is on the timeline for good, and the audit trail records who added it.
Open the Decision tab to carry on.
Explore
Casefile writes the status changes
Proposing moved the case to Pending decision, and Casefile put that on the timeline itself. Nothing here can be edited or removed.
Open the Decision tab to carry on.
Explore
Duty of care
The institution's own controls, assessed before the customer's conduct. Ten of the eleven that apply were applied. REP-01 was not: the case has no National Fraud Portal submission.
Open a group to see each control and its evidence.
Explore
Audit trail
Every create, change, decision, download and export is recorded here automatically, newest first, and the database refuses edits to this table.
Your own steps appear at the top.
DEMO-2026-0002
Fake PDRM officer, parcel with drugs
Demo Bank Berhad (synthetic data)
- 1. Case summaryAuthorised (customer initiated the payment). Impersonation scam (officials, bank, parcel). MYR 65,000.00 lost, MYR 12,000.00 recovered. Reported to NSRC 15 Oct 2026, 11:30.
- 2. Customer's accountA caller claiming to be from PDRM Bukit Aman said a parcel containing drugs was registered in the customer's name and instructed him to move his savings to a safe account for investigation. (Synthetic demonstration data.)
- 3. ClassificationCustomer Initiated Payment: Yes. Third Party Instruction: Yes. Customer Ignored Warning: Yes.
- 4. Duty-of-care assessment (institution's controls)12 controls: 10 Applied, 1 Not applied (REP-01), 1 Not assessed (REP-02), assessed by Farah Lim.
- 5. Timeline and evidenceEvery entry, oldest first, with its files and their SHA-256 checksums.9 entries and 1 file10 entries and 1 file
- 6. Reimbursement decisionGoodwill payment, MYR 15,900.00, split 30% / 70%. Proposed by Farah Lim, approved by Kumar Selvam.
- 7. Audit trailEvery recorded action before this file was generated.21 entries22 entries
Prepared by (name, signature, date)Reviewed by (name, signature, date)
In Varion Casefile the case file opens as a page to print or save as PDF.
Customer's account of events
A caller claiming to be from PDRM Bukit Aman said a parcel containing drugs was registered in the customer's name and instructed him to move his savings to a safe account for investigation. (Synthetic demonstration data.)
Regulatory reporting
- NSRC (997)
- 15 Oct 2026, 11:30
- PayNet National Fraud Portal
- Not submitted
- Police report
- KL/DEMO/2026/5002
Road to decision
- ClassifiedAuthorised (customer initiated the payment)
- Reported to NSRC15 Oct 2026, 11:30
- Duty of care assessed10 of 11 applied, 1 gap(s)
- DecisionGuidance: Goodwill paymentGoodwill payment: Awaiting reviewGoodwill payment: Approved
- ClosedClose once the customer is informed
Before this is final
Independent review by a reviewer or administrator is required before the decision is final (four-eyes principle).
Timeline and evidence
Append-only. Entries cannot be edited or removed once recorded.
- Internal noteStatus changed to ClosedCustomer informed of the outcome.Recorded by Farah LimRecorded by Kumar Selvam
- Internal noteStatus changed to DecidedDecision Goodwill payment approved.Recorded by Kumar Selvam
- Internal noteStatus changed to Pending decisionA reimbursement decision was proposed and is awaiting independent review.Recorded by Farah Lim
- Funds freeze / trace requestFreeze request sent to the receiving bankRequest to hold the funds while the trace runs.Recorded by Farah LimRecorded by Kumar Selvam
- Internal noteStatus changed to InvestigatingRecorded by Farah Lim
- Internal noteStatus changed to TriageRecorded by Farah Lim
- Police reportPolice report recorded (KL/DEMO/2026/5002)Recorded by Farah Lim
- Internal noteCase openedCase DEMO-2026-0002 created. 12 duty-of-care controls added for assessment.Recorded by Farah Lim
- NSRC reportReported to the National Scam Response Centre (NSRC)Recorded by Farah Lim
- Customer contactCustomer interviewed by phoneStatement recorded; customer consented to the investigation and to data sharing with NSRC where applicable.customer-statement.txtRecorded by Farah Lim
Assess the institution's own controls before weighing the customer's conduct.
Duty-of-care checklist
11 of 11 applicable controls assessed
Authentication3 Applied
- AUTH-01Secure (non-SMS-OTP) authentication used for the transactionTransaction was authenticated with in-app or equivalent secure authentication rather than SMS OTP, in line with the migration directive.Confirmed from system records (AUTH-01).Assessed by Farah LimApplied
- AUTH-02Single-device binding enforcedOnline banking access was restricted to one registered secure device at the time of the transaction.Confirmed from system records (AUTH-02).Assessed by Farah LimApplied
- AUTH-03Cooling-off period applied to first-time enrolment or new deviceA cooling-off period was applied before a newly enrolled account or newly registered device could transact.Confirmed from system records (AUTH-03).Assessed by Farah LimApplied
Transaction controls2 Applied
- TXN-01Transaction limits enforcedDaily and per-transaction limits, including customer-set limits, were enforced for the disputed transaction(s).Confirmed from system records (TXN-01).Assessed by Farah LimApplied
- TXN-02Call-back or additional verification for high-risk transactionA call-back or additional verification step was performed for a high-risk, high-value or first-time payee transaction.Confirmed from system records (TXN-02).Assessed by Farah LimApplied
Customer warnings2 Applied
- WARN-01Scam warning shown at point of paymentA scam warning, payee confirmation or risk message was displayed to the customer before the payment was confirmed.Confirmed from system records (WARN-01).Assessed by Farah LimApplied
- WARN-02Prior fraud awareness communication to customerThe customer had received fraud awareness communication (in-app notice, campaign, statement insert) relevant to this scam type before the incident.Confirmed from system records (WARN-02).Assessed by Farah LimApplied
Detection and response3 Applied
- DET-01Anomaly detection alert raisedFraud monitoring generated an alert for the out-of-pattern transaction and the alert was actioned.Confirmed from system records (DET-01).Assessed by Farah LimApplied
- RESP-01Kill switch available and actionedThe self-service kill switch was available and, once the customer reported, access was suspended promptly.Confirmed from system records (RESP-01).Assessed by Farah LimApplied
- RESP-02Report acknowledged and funds trace initiated within SLAThe customer's report was acknowledged and a funds trace or freeze request was initiated within the institution's service level.Confirmed from system records (RESP-02).Assessed by Farah LimApplied
Reporting and timeliness1 Not applied, 1 Not assessed
- REP-01Reported to NSRC and National Fraud Portal on timeThe case was reported to the National Scam Response Centre and lodged in the National Fraud Portal within the institution's required timeframe.Reported to NSRC on 15 Oct 2026. No National Fraud Portal submission is recorded for this case.Assessed by Farah LimNot applied
- REP-02Investigation completed within prescribed timeframeThe investigation and outcome communication met the timeframe prescribed under SEFT, or financial assistance was provided where it did not.Applies to unauthorised transactions only; not relevant to this case.Not assessed
Decisions
No decision has been proposed yet. Complete the duty-of-care assessment, then propose the outcome for independent review.
Goodwill payment MYR 15,900.00Awaiting reviewApproved
Waiting for someone else to review (four-eyes)
- Liability split
- Institution 30% · Customer 70%
- Rationale
- Demo rationale: bank-side control gap(s) REP-01 identified. Customer factors considered as recorded in the indicators.
- Proposed by
- Farah Lim
- Approved by
- Kumar Selvam
- Guidance at the time
- Goodwill payment
Audit trail for this case
Newest first; the database refuses edits to this table
case.file_generatedDEMO-2026-0002: case file generatedFarah LimKumar Selvamcase.status_changedDEMO-2026-0002: Decided to ClosedFarah LimKumar Selvamdecision.approvedDEMO-2026-0002: decision approvedKumar Selvamdecision.proposedDEMO-2026-0002: Goodwill payment proposed (15900.00 MYR)Farah Limcase.event_addedDEMO-2026-0002: Funds freeze / trace request recordedFarah LimKumar Selvamcase.control_assessedDEMO-2026-0002: REP-01 marked Not appliedFarah Limcase.control_assessedDEMO-2026-0002: RESP-02 marked AppliedFarah Limcase.control_assessedDEMO-2026-0002: RESP-01 marked AppliedFarah Limcase.control_assessedDEMO-2026-0002: WARN-02 marked AppliedFarah Limcase.control_assessedDEMO-2026-0002: WARN-01 marked AppliedFarah Limcase.control_assessedDEMO-2026-0002: DET-01 marked AppliedFarah Limcase.control_assessedDEMO-2026-0002: TXN-02 marked AppliedFarah Limcase.control_assessedDEMO-2026-0002: TXN-01 marked AppliedFarah Limcase.control_assessedDEMO-2026-0002: AUTH-03 marked AppliedFarah Limcase.control_assessedDEMO-2026-0002: AUTH-02 marked AppliedFarah Limcase.control_assessedDEMO-2026-0002: AUTH-01 marked AppliedFarah Limcase.attachment_addedDEMO-2026-0002: evidence file "customer-statement.txt" attachedFarah Limcase.event_addedDEMO-2026-0002: Customer contact recordedFarah Limcase.status_changedDEMO-2026-0002: Triage to InvestigatingFarah Limcase.status_changedDEMO-2026-0002: New to TriageFarah Limcase.reporting_updatedDEMO-2026-0002: regulatory reporting details updatedFarah Limcase.assignedDEMO-2026-0002 assigned to Farah LimFarah Limcase.createdCreated case DEMO-2026-0002Farah Lim
How to use this demo
- Open the Decision tab and propose the outcome as Farah.Done
- Switch to Kumar, the reviewer, and approve it.Done
- Close the case.Done
- Open the case file.Done
Also try Add a timeline entry, and look through Duty of care and Audit.
Start againEvery report line, traced to its source.
Pick a line from this synthetic weekly report to see the record it relies on.
Explore EvidenceInteractive demo
Try Varion Evidence
The guide card in the demo shows what to click next. Everything runs on synthetic data, and nothing you click leaves this page.
Meridian Works · 31 Aug – 06 Sep 2026 · revision 07Meridian Works · 31 Aug – 06 Sep 2026 · revision 08
Review queueReady for reviewDraftSynthetic data
Step 1 of 3
Check the calculation
This line is a calculation from row 18 of the progress register: 36 of 48 pile caps is 75%. Evidence asks the reviewer to check it against the source.
Tick the box under Reviewer decision.
Step 1 of 3
Approve the line
With the calculation checked, Approve claim records Sofia's review of revision 1 and confirms the calculation in one step.
Press Approve claim.
Step 1 of 3
Now the calculation line
Completed work is reviewed. Progress against baseline still needs its calculation checked and the line approved.
Pick Progress against baseline.
Step 1 of 3
Approval needs a reviewer
Nur Aina is the document controller. Evidence offers Approve claim only to a reviewer.
Switch to Sofia Lim, the reviewer.
Step 2 of 3
Approval needs a reviewer
Nur Aina is the document controller. Evidence offers Approve claim only to a reviewer.
Switch to Sofia Lim, the reviewer.
Step 2 of 3
Line reviewed
Revision 1 is reviewed by Sofia Lim, and its calculation is confirmed. Both are conditions for release.
Pick Completed work.
Step 2 of 3
A source in Bahasa Malaysia
This line cites page 4 of the weekly site diary. Compare the Malay excerpt and its English explanation with the statement before approving.
Press Approve claim.
Step 3 of 3
What if a source is withdrawn?
Records change after review. In Evidence a document controller, not a reviewer, decides which records may support a report.
Switch to Nur Aina, the document controller.
Step 3 of 3
Withdraw the site diary
Nur Aina sets the diary's authority to Withdrawn. Before she saves, Evidence shows which reviews the change will undo.
Press Save authority change.
Step 3 of 3
You are Nur Aina, the document controller
She decides which records may support a report, such as the site diary behind Completed work.
Pick Completed work.
Step 3 of 3
The review was undone
Evidence cleared the review of the line that cited the diary, and the report moved to revision 08, back in Draft, so it must be submitted again.
Open Release preflight.
Step 3 of 3
The report changed
Withdrawing the diary moved the report to revision 08, back in Draft. Release preflight shows what release now waits for.
Open Release preflight.
Explore
This line cannot be approved
Its source, RFI-017, is unverified, and the statement conflicts with it: the consultant's response is still pending. Evidence blocks approval until both are resolved.
Pick another line to carry on.
Explore
A forecast line
This line forecasts a delivery from the procurement schedule, revision B. A reviewer approves a forecast like any other line.
Press Approve claim, or pick another line.
Explore
A forecast line
This line forecasts a delivery from the procurement schedule, revision B. A reviewer approves a forecast like any other line.
Pick another line to carry on.
Explore
Forecast reviewed
Revision 1 of this line is reviewed by Sofia Lim. Release needs every line reviewed, not only the ones in the steps.
Pick another line to carry on.
Explore
Release preflight
Every gate must pass on the exact revision being released. The RFI-017 line fails three of them, so this report cannot be released yet.
Go back to Review queue to carry on.
Done
What release waits for
The withdrawn diary fails its evidence gate, its line is no longer reviewed, and revision 08 is in Draft. Release waits until every gate passes.
That is the whole demo. Explore, or start again.
Start again0 of 4 claims reviewed1 of 4 claims reviewed2 of 4 claims reviewed3 of 4 claims reviewed
VE-CIV-001Rev CCSV
Structural progress register
Row 18 · columns B–E
Exact source excerpt English
Zone B | Pile caps completed: 36 | Approved scope: 48 | Unit: each
Deterministic calculationConfirmed
36 ÷ 48 × 100 = 75%
Completed / approved scope · pile caps. The denominator must be the approved scope, not a working figure.
Reviewer decision
Approval interactions are available to the reviewer role. Switch the demo role to reviewer to inspect them.
I checked the inputs, units and calculation against the source.
Approve claimEvidence states
- Evidence available1 approved source covers the reporting period.
- Calculation unconfirmedThe reviewer must confirm inputs, units and the rule before approving.
- Calculation confirmedA reviewer checked inputs, units and the rule against the source.
- Needs reviewRevision 1 has no independent review yet.
- ReviewedRevision 1 was reviewed by Sofia Lim.
VE-CIV-002Rev CPDF
Laporan tapak mingguan
Page 4 · Section 2.1
Exact source excerpt Malay
Kerja pemasangan tetulang bagi zon B telah disiapkan pada 3 September 2026. Pemeriksaan direkodkan dalam daftar tapak.English explanation
Reinforcement installation for Zone B was completed on 3 September 2026. An inspection was recorded in the site register.
Reviewer decision
Approval interactions are available to the reviewer role. Switch the demo role to reviewer to inspect them.
Approval is disabled while evidence states block this claim.
Approve claimAuthority state
Set Laporan tapak mingguan, revision C, from Approved to Withdrawn.
Saving invalidates 1 review across 1 claim.
Evidence states
- Source withdrawnLaporan tapak mingguan was withdrawn. It cannot support a released claim.
- Evidence available1 approved source covers the reporting period.
- Needs reviewRevision 1 has no independent review yet.
- ReviewedRevision 1 was reviewed by Sofia Lim.
VE-CIV-003Rev BPDF
Procurement delivery schedule
Page 2 · Delivery milestones
Exact source excerpt English
Cable tray delivery: 11 September 2026. Supplier confirmation remains pending.
Reviewer decision
Approval interactions are available to the reviewer role. Switch the demo role to reviewer to inspect them.
Evidence states
- Evidence available1 approved source covers the reporting period.
- Needs reviewRevision 1 has no independent review yet.
- ReviewedRevision 1 was reviewed by Sofia Lim.
VE-CIV-004Rev APDF
RFI-017 · Drawing clarification
Page 1 · Proposed clarification
Exact source excerpt English
Revised opening dimensions are proposed. Consultant response is pending.
Reviewer decision
Approval interactions are available to the reviewer role. Switch the demo role to reviewer to inspect them.
Approval is disabled while evidence states block this claim.
Approve claimEvidence states
- Conflicting recordsStatement conflicts with the source: consultant response is pending.
- Source unverifiedRFI-017 · Drawing clarification has no confirmed approval. A controller must set its authority.
- Needs reviewRevision 1 has no independent review yet.
Release preflight
Every gate must pass on the exact revision you are releasing. The release is transactional: it either records the whole snapshot or nothing.
Authorisation
- A project existsMeridian WorksPassedFailed
- Released by an authorised reviewerSofia Lim holds the reviewer role.Your current role is controller. Only a reviewer can release.PassedFailed
- Reviewer is not the authorAuthor and releasing reviewer are different people.PassedFailed
Report
- The report has claims4 claims in revision 7.4 claims in revision 8.PassedFailed
- Current revision submitted for reviewStatus: Ready for review.Status is Draft. The author must submit revision 8.PassedFailed
Claims
- Progress against baseline: eligible evidenceSources are approved, current and extracted.PassedFailed
- Progress against baseline: current revision reviewedRevision 1 reviewed.Revision 1 needs an independent review.PassedFailed
- Progress against baseline: calculation confirmedInputs, units and rule confirmed by the reviewer.A reviewer must confirm the calculation against its source.PassedFailed
- Completed work: eligible evidenceSources are approved, current and extracted.Laporan tapak mingguan: withdrawnPassedFailed
- Completed work: current revision reviewedRevision 1 reviewed.Revision 1 needs an independent review.PassedFailed
- Procurement and delivery: eligible evidenceSources are approved, current and extracted.PassedFailed
- Procurement and delivery: current revision reviewedRevision 1 reviewed.Revision 1 needs an independent review.PassedFailed
- RFIs and changes: eligible evidenceStatement conflicts with the source: consultant response is pending.PassedFailed
- RFIs and changes: RFI-017 · Drawing clarification: unverifiedRFI-017 · Drawing clarification: unverifiedPassedFailed
- RFIs and changes: current revision reviewedRevision 1 needs an independent review.PassedFailed
How to use this demo
- Tick the calculation box and approve Progress against baseline.Done
- Approve Completed work against the Malay site diary.Done
- Switch to Nur Aina, withdraw the diary, then open Release preflight.Done
Also try Procurement and delivery, a forecast, and RFIs and changes, the line that cannot be approved.
Start againHow a project runs.
Four steps. Price, timeline and scope are set after a scoping call.

Trace
We map how the work really happens.

Prototype
A working version on synthetic data.

Pilot
Shaped to your workflow, in phases.

Scale
More teams, more steps, more systems.

Hirthic
Managing Director, Varion AI
A senior software engineer in payment systems, backend, data engineering and AI. He designs and builds every Varion product.
Meet HirthicSee our software working on synthetic data.
A 30-minute walkthrough, then a conversation about your workflow.
Request a walkthroughYou will hear back from Hirthic.
